Experience

Project experience, clearly attributed.

Projects include direct MCE engagements and prior-affiliation work by the firm’s principal. Each entry identifies the role and the contracting party or prior affiliation so you know exactly whose work it is.

Direct MCE Engagements

Contracting party: Martinson Consulting Engineers

Wild Horse Inn Water System
Groundwater Well Improvements, Treatment & Booster Pump System
Grand County, CO
Groundwater well improvements, treatment, and booster pump system design with construction-phase support through installation and startup. Focused upgrades to improve reliability for a small Mountain West system.
EOR · MCE
In Construction
Camelot POA Water System
Project Needs Assessment & Preliminary Engineering Report
Falcon, CO
PNA & PER covering wells, treatment, storage, and booster pumping. Funding-readiness focus with defensible basis for scope, cost, and phasing.
EOR · MCE
Funding Pending
Town of Frisco
Extra-Territorial Water Demand Evaluation
Town of Frisco, CO
Evaluation of historic and future water demands for extra-territorial connections, and a methodology supporting a cash-in-lieu framework for staff and decision-maker review.
EOR · MCE
Completed
Evans Roadway Lift Station
Design & Permitting
City of Evans, CO · 0.25 MGD
Design and permitting of a 0.25 MGD submersible lift station with hydraulic and equipment selection support, packaged for permitting and construction.
EOR · MCE
Completed
Lift Station Overflow Improvements
Repermitting & Modifications
Town of Erie, CO
Repermitting and modification of an existing lift station to address increased hydraulic loading, with agency coordination and compliance documentation.
EOR · MCE
Completed
Packaged MBR Wastewater Facilities
Program · Multiple Stages
Various clients (CO) · with Aquaworks DBO (Prime & EOR)
Design support across thirteen packaged MBR facilities. Engineering coordination across varied stages and site constraints, focused on treatment design, operability, and delivery requirements.
Design Partner
Program
Wastewater Facility CPE
Composite Performance Evaluation
Garfield County, CO (client confidential)
Composite Performance Evaluation of existing extended aeration infrastructure, with nutrient removal evaluation and documentation supporting upgrade and compliance planning.
EOR · MCE
Completed

The work below reflects the professional experience of the firm’s principal under previous engineering firms. Each project identifies the prior affiliation.

Featured Prior-Affiliation Work

Principal’s experience at FEI Engineers (now Plummer Associates) and Plummer Associates.

Central Park Lift Station
Lift Station + Odor Control
City & County of Denver · 3.5 MGD
High-visibility urban lift station with odor control integration and emergency response features.
EOR
Plummer
Ashcroft Lift Station + Dual Force Main
Open Cut + Trenchless
City of Greeley · 3.0 MGD
Self-priming lift station design paired with dual 12-inch force main (open cut + trenchless).
EOR
Plummer
Vertical Well Field Expansion
Intake Gallery + 4 Vertical Wells + Transmission
City of Steamboat Springs
Intake gallery expansion with four vertical wells and approximately one mile of transmission pipeline coordination.
Project Lead
Plummer
Storage Tank + WTP Upgrades
Storage & Treatment Improvements
Town of Dillon · 1.8 MG
1.8 MG tank design, clearwell evaluation, and chemical feed upgrades focused on long-term reliability.
Project Lead
Plummer
Peak Lift Station + Force Main
Lift Station + Force Main
Colorado Springs · 1.0 MGD
Representative municipal lift station and force main package delivered for implementation.
EOR
Plummer
ASR Pilot Facility
Aquifer Storage & Recovery
City of Northglenn
Aquifer Storage & Recovery pilot system evaluation, design, and pilot coordination for municipal supply resiliency.
Project Lead
Plummer
Lone Rock Retreat Lift Station
High-Head / Low-Flow Pumping
Bailey area, CO
High-head, low-flow lift station with progressive cavity / flooded suction configuration for small-system constraints.
EOR
Plummer
Well 7 Improvements
Well Rehab + 75 HP VTP + Treatment/Site
Town of Frisco · 75 HP VTP
Groundwater well rehabilitation, 75 HP vertical turbine pump installation, and treatment/site coordination.
EOR
Plummer
Surface Water Intake Improvements
Flume + Transmission Upgrades
Town of Frisco
Intake design, flume installation for flow monitoring, and transmission pipeline upgrade coordination.
EOR
Plummer
Sun Communities Treatment + Storage
300,000-Gallon Tank + GW Treatment
Town of Larkspur · 300,000 gal
300,000-gallon storage tank and groundwater treatment system design coordinated through deliverables.
EOR
Plummer
CSU Mountain Campus MBR
Packaged MBR Wastewater Facility
Fort Collins · 34,000 GPD
Packaged MBR facility design support with process and operability coordination for small-system treatment.
Project Lead
Plummer
Water & Wastewater Master Plans
Master Planning
Town of Keenesburg
Master planning with CIP-style prioritization and phased improvements supporting funding readiness.
Project Lead
Plummer

Selected Clients Served

Under current and prior firm affiliations.

City & County of Denver, CO
Town of Georgetown, CO
City of Greeley, CO
St. Vrain Sanitation District
Colorado Springs, CO
Eagle River Water & Sanitation District
City of Steamboat Springs, CO
Town of Nederland, CO
Town of Dillon, CO
Town of Lyons, CO
City of Northglenn, CO
Clear Creek County, CO
Colorado State University
City of Boulder, CO
Town of Keenesburg, CO
City of Golden, CO
City & County of Broomfield, CO
North Table Mountain Water District
Dominion Water & Sanitation District
Castle Pines area, CO
Town of Larkspur, CO
City of Dacono, CO
Bailey area, CO
Sun Communities (Larkspur, CO)

Design partners: Aquaworks DBO, Inc.

Have a project that needs direct engineering leadership?